Albert AI Permits

Every permit your build needs — known before you start, not discovered along the way.

Planning, building, and local law approvals are where projects quietly lose months. Albert AI Permits tells you exactly which approvals your project needs for your address and council, what each one requires, and the order to get them in — so nothing stops your build that you didn't see coming.
Plans over 25MB? Share them via a Google Drive, Dropbox, or WeTransfer link in your email.
Albert AI Permits dashboard analysing a property address to identify planning, building, and local law approvals required before construction begins.

" Most people think a build needs "a permit." It usually needs several — a planning permit from council, a building permit from a surveyor, and a handful of local law approvals before you can even put a skip on the nature strip. Miss one, or design something your overlay won't allow, and the project stops. Albert AI Permits maps the whole approval path before you commit."

Features

What Albert AI Permits Does

Albert AI Permits turns your project information into a complete approval roadmap that identifies every permit your build needs, the constraints on your land, and the correct order to obtain them.
01

Know exactly which permits you need

For your address, your council, and what you're proposing — planning, building, local law, and report-and-consent. No guessing, no "we'll find out later."
02

See the constraints before you design

Heritage overlays, neighbourhood-character controls, easements — the things that decide what you're allowed to build. Find them at the start, not when an application is refused.
03

The right order, every time

Planning before building, local law alongside, report-and-consent where siting needs it. Albert AI sequences the path so approvals don't bottleneck each other.
04

Everything each application needs, assembled

The documents, plans, and information each permit requires — gathered and checked, so applications go in complete and don't bounce back for more information.

The Process

How It Works

Albert AI Permits analyses your address, council requirements, and project details to identify the approvals your build requires before construction can begin.

01

Tell us the property and what you're thinking of building

Share your property details and your building plans with our team at myhome@albertliving.com.au
or partnerships@albertliving.com.au.

02

Albert AI analyses your address

The platform reads your address against its council, overlays, zoning, local laws, and approval triggers.

03

Receive your complete permit roadmap

Get every approval your project requires, the order to obtain them, and everything needed to lodge each application before construction begins.

Output

What you get from us.

A complete permit map for your build: every planning, building, and local law approval your project needs for its address and council, the constraints on the land that shape what you can design, the order to lodge them in, and what each application requires — so you walk into the approvals process knowing the whole path, not discovering it one refusal at a time.

Albert AI Permits report showing required approvals, site constraints, permit sequence, and project readiness before construction.

Custom Joinery

70 Cobden Feature Wall

```

Next in the pipeline → Albert AI Program

Approvals mapped, now build the timeline to deliver it.

Explore Albert AI Program
Albert AI Program dashboard showing a trade-by-trade construction timeline and project schedule.
```

Albert Living Currently covering Melbourne's inner-east — the City of Boroondara and surrounding councils — and expanding.